AnyKanban

Follow work through links

A card that is not a backlog item still has to answer "how far along is this?". These pages are how.

A support request, a change request or a business request sits outside the backlog on purpose, because a backlog holds how work gets built rather than what was asked for. AnyKanban joins the two with links instead of hierarchy: Related links to the backlog items that implement a request, child tasks for the steps that never deserve a backlog item of their own, and Tested By links for the tests that cover a change. Every rollup count a card shows is a link to the items it was counted from.

The pages

What every page here assumes

Examples use the demo dataset, whose only projects are Claims Platform, Core Insurance and Digital Banking.